Transfer & transformer station
The ideal all-rounder for your reliable transformer station medium-voltage connection.
Online enquiry
Solar park station
The first purely solar park-internal transformer station.
Reliable for solar parks of any size.
Online enquiry
Transfer & transformer station
The ideal all-rounder for your reliable transformer station medium-voltage connection.
Online enquiry
Solar park station
The first purely solar park-internal transformer station. Reliable for solar parks of any size.
Online enquiry
kW
0
Intelligent energy distribution for large solar parks. The next generation of solar park-internal container stations.
Centralised switching technology for modern energy systems. Ideal for trade, industry and agriculture.
Production in Germany

Compatible with all German medium-voltage networks, arc fault certified for nationwide use.

Delivery time from 28 weeks

Faster implementation thanks to in-house production and semi-automated planning process.

Full flexibility & support

Customised configuration of transformer power, voltage levels and balance circuits according to project requirements.

Nordhausen solar park station for plannable feed-in and a medium voltage that does not slow down expansions

One Nordhausen solar park station is the technical point at which PV power switches to reliable grid operation. The initial state can usually be clearly defined. The station becomes decisive later on when additional inverters are added, feeders are expanded or the project grows step by step. It is precisely in this phase that it becomes clear whether the medium voltage was conceived as a long-term infrastructure or whether each expansion stage requires new interventions in the existing system.

For quiet operation, it is not enough to fulfil just one connected load. One Nordhausen medium-voltage station must function as a system: Cubicle layout, connection routing, protection technology, measurement and documentation must reflect the same technical line. If the station remains logical on the inside, tests can be planned more easily, service calls can be better prepared and faults can be localised more quickly because the bay allocation and protective functions remain traceable.

Reserve does not mean a generalised increase in size. Reserve means structurally preparing the next step: clear expansion points, protection coordination that remains consistent even in later operating states, and a station structure that remains clear even after further expansion stages.

Switch panel structure that provides immediate orientation in everyday life

An overview is crucial in operation. One Nordhausen solar park station has a strong effect when field assignment, labelling and accessibility work well together. Recurring inspections run faster because maintenance does not start with searching. This reduces downtime windows and minimises risks during interventions because processes remain clear.

The combination of structure and protection logic is particularly important. If protection functions match the field division and are parameterised in a comprehensible manner, a fault can be specifically limited. This means that availability remains high because disconnection only takes place where it is really necessary.

Define expansion path before the next stage is due

Many PV projects grow in stages. Without a prepared connection route, the next expansion quickly becomes a conversion of the existing system, including additional coordination and interruptions. That is why it is worthwhile Nordhausen medium-voltage station set guard rails early on: Where should later outlets be connected, how can measurement remain consistent, how can the protection logic remain clean?.

Once these points have been clarified in the concept, expansion becomes calculable. New services build on the existing structure instead of breaking it up. This brings calm to appointments and keeps the ward manageable in the long term.

Container Trafo Line BG AVIF - Solar park station Nordhausen
Transformer stations

for the safe mounting and operation of transformer and switching technology.

One Nordhausen transfer station must work reliably for years. This includes maintenance, tests, switching operations and technical adjustments. This is why a service-friendly design is crucial: practical access, accessible components and documentation that clearly depicts the actual station status.

When switching logic and protection technology work together harmoniously, operation becomes more controllable. Service calls can be prepared in a targeted manner, faults can be localised more quickly and expansions can be implemented step by step. This reduces unnecessary interruptions and keeps the medium-voltage side stable, even if the site grows.

High operational reliability

Reliable in continuous operation.

Weather protection

Designed for outdoor use

Configurable

Customisable to project requirements.

Versatile in use

For industry and infrastructure.

Optimised for continuous operation

Stable and powerful.

Quick installation

Simply by crane.

Compact design

Space-saving and efficient.

Compatible with all German medium-voltage grids

Arc fault certified for use throughout Germany.

Standard-compliant design

We take over the engineering and obtain approval from the responsible energy supply company

Typical fields of application in Nordhausen: PV parks, repowering, storage connection and hybrid energy sites

Compact stations when space is limited and tidiness is still a must

Compact solutions make sense when compactness is not at the expense of maintenance and accessibility. A good arrangement of components, neat cable routing and clear labelling ensure that service is not slowed down. Even when space is at a premium, internal organisation remains the decisive factor.

If the station remains structured, later outlets can be added without blocking service routes or making the switching logic confusing. This means that the solution remains manageable even with several expansion stages.

Concrete transformer compact station and transfer station for photovoltaics, e-mobility, wind power and grid operators

Clean technical coordination of PV, storage and charging infrastructure in Nordhausen

As soon as storage or charging infrastructure become relevant on site, the demands on the medium voltage increase. Feed-in, charging power and load peaks hit the switchgear at the same time. This only becomes stable if the substation logic and protection coordination map these operating states and priorities in the system remain clear.

Those who consider these issues as an overall system at an early stage reduce conflicting objectives in terms of performance design and protection technology. Expansions remain possible without every new element upsetting the existing system. The station remains comprehensible, even if the location can do more than just supply power.

Illustration of an e-mobility station, developed for the reliable power supply of charging stations for electric vehicles. Ideal for setting up centralised and decentralised charging infrastructure. Compact stations

Solar park stations in Nordhausen with clean feed-in logic and prepared expansion path

One Nordhausen solar park station should reliably manage the feed-in and enable subsequent performance steps without every expansion becoming a conversion project. The key lies in a field logic that provides for expansion and in a connection routing that maps the next step in a technically clean way. If the protection concept and measurement match, the station remains comprehensible in everyday life and continues to develop in an organised manner.

If this preparation is lacking, typical follow-up costs arise: additional coordination, rework in existing buildings and unnecessary downtime windows. With a clearly prepared expansion path, the next stage remains calculable.

Solar park station for PV systems and photovoltaic transformer
NSHV Black Line AVIF - Solarparkstation Nordhausen
LVMD

for safe and reliable power distribution in electrical installations.

EPC solutions in Nordhausen with clear responsibility and clean handover

Planning and control, procurement, construction and assembly work

If planning, procurement, implementation and commissioning are managed in one line, interface risks are significantly reduced. Decisions become reliable earlier, checkpoints clearer and handovers cleaner. This reduces the coordination effort and ensures that the station starts operation without any unresolved issues.

Extensive project experience
Complete turnkey solutions
Technical excellence & quality assurance
A central point of contact
Minimised risk & deadline reliability
Integrated energy infrastructure

Technical quality from Germany for permanently stable medium voltage

In the medium-voltage range, trust is created during operation. One Nordhausen solar park station must be easy to understand, remain quickly accessible for servicing and function stably in the event of expansions. A clear structure, consistent protection logic and documents that reflect the actual structure make operation easier to plan and reduce risk.

Opened FABER E-TEC compact transformer station with visible technology - solution for photovoltaics, grid/transfer and e-mobility
Compact transformer station from FABER E-TEC in the solar park at sunset - grid connection and transfer station for photovoltaics
Expertise, experience & production in Germany
Expertise & experience
Highest quality & reliability
Environmentally friendly technologies
Opened compact station with low-voltage main distribution board and switching technology from Faber E-Tec buy online
Transformer station for connecting a fast charging station to the grid - energy infrastructure for e-mobility in outdoor areas

Enquire about the Nordhausen solar park station and set up a technically sound project launch

Stable operation begins with a clean start. If the feed-in power, area, grid requirements and expansion targets are clear at an early stage, the Nordhausen solar park station be planned precisely. This reduces queries, avoids subsequent corrections and creates a solution that remains stable even as it grows.

Compact station Request a quote

Customised offers for transformer stations - made easy!

Order solar park station directly now

Fill in and receive PV transformer station offer!

"*" indicates required fields

1Project
2Net
3Contact us
Product type*
Project location*
Undervoltage (kV)*
Benötigen Sie für Ihr PV-Projekt eine Trafostation mit 400 V, nutzen Sie bitte das Anfrageformular „Kompaktstation“.

E-mobility made easy with us!

Simply fill out the transformer station enquiry form and plan your charging station infrastructure!

"*" indicates required fields

1Project
2Net
3Contact us
Product type*
Project location*

7200 KW Secure container offer

Order containerised transformer station for solar park quickly and easily.

"*" indicates required fields

1Project
2Net
3Contact us
Product type*
Project location*

Low-voltage main distribution board

Interested in our NSHV?
Frequently asked questions about the Nordhausen solar park station
Find quick answers to frequently asked questions about our products & services.

The planned feed-in power, the available area, the desired voltage level and the planned expansion stage are important. In addition, information on the later development of the project helps to ensure that the station can be planned with a sensible reserve structure from the outset.

The decisive factor is a clear station logic instead of a pure initial design. If switch panels, protection technology and connection structure are properly prepared, additional power steps can be integrated in an organised manner. This keeps the system stable and makes subsequent conversions much easier.

Because it determines how the station reacts in the event of a fault and how selectively protective functions work. Proper protection coordination improves availability, reduces consequential risks and helps to localise faults more quickly. This is a key factor for smooth system operation.

It saves time and increases safety. Maintenance, troubleshooting and subsequent adjustments can be implemented much more efficiently if the protection parameters, switching logic and station structure are clearly documented. This is a major advantage, especially for growing projects.

Cool number
0