References in grid connection, storage and charging infrastructure
Transformer substations, local distribution substations, battery storage systems and complete EPC projects – delivered and commissioned. The following overview shows what we have implemented in recent years, broken down by year, capacity and application.
Heckhuscheid East+West
Performance
17.8 MWp
BESS
31.7 MWh
Stations
5 + handover
Üttfeld
Performance
5.3 MWp
BESS
8.4 MWh
Stations
2 + handover
Euskirchen
Performance
7.3 MWp
Stations
2 × 3.150 kVA
Area
7.1 ha
Rödinghausen
Performance
3.2 MWp
Station
1 x 3.150
BESS
5.8 MWh
Munster Ulster
Performance
19.2 MWp
BESS
60.2 MWh
Stations
20 + handover
Munster Alvern
Performance
3.190 kWp
Stations
1 x 3,150 + handover
Porta Westfalica
Performance
6.1 MWp
BESS
10.9 MWh
Stations
3 x 3.150
Spenge
Performance
800 kWp
BESS
1.7 MWh
Transformer station
1,000 kVA
Oelde / Ennigerloh
Performance
11.7 MWp
Area
10 ha
Stations
4 + handover
Falkenberg
Performance
6.8 MWp
Stations
2 + handover
Pfaffenhofen
Performance
5.7 MWp
Stations
2 x 2.500
Seven BESS
Transformer / substation
2.500 kVA
Wittenberge
Performance
2.7 MWp
Station
2.500 kVA
Ohorn
Performance
3.98 MWp
Stations
1 x 2.500
Our references in the grid areas
Each network operator has its own technical connection conditions, application forms and acceptance processes. We know the requirements of the grid areas in which we build, from design and application through to commissioning.
Project locations: Euskirchen • Gescher • Sankt Augustin • Essen • Bad Segeberg • Kreuztal • Hürth • Fürstenau • Rietberg • Bad Bentheim • Hünxe • Beltheim • Warstein • Erftstadt • Haren (Ems) • Grafschaft • Steinfeld (Oldenburg) • Melle • Bramsche • Recklinghausen • Bernkastel-Kues • Paderborn • Mechernich • Bissendorf • Bohmte • Damme • Rheda-Wiedenbrück • Bad Iburg • Bedburg • Wismar • Laatzen • Herford • Rees • Langenthal • Neuss • Wittlich • Prüm • Lage • Simmern/Hunsrück • Siegen • Bünde • Bautzen • Brilon • Idar-Oberstein • Langenfeld (Rheinland) • Ochtendung
Project locations: Ansbach • Baunach • Bergkirchen • Engelsberg • Euerbach • Haag in Oberbayern • Hagelstadt • Hammelburg • Himmelkron • Höchstadt an der Aisch • Iggensbach • Kirchdorf • Kohlberg • Königsdorf • Marktleugast • Mengkofen • Metten • Moosburg an der Isar • Neufahrn bei Freising • Niedernberg • Pfaffenhofen an der Ilm • Pirk • Pleiskirchen • Pöring • Pottenstein • Premenreuth • Pullenreuth • Rötz • Ruhpolding • Schlehdorf • Schnabelwaid • Schwabhausen • Schwandorf • Simbach am Inn • Stockstadt am Main • Tacherting • Taufkirchen • Vohenstrauß • Weiden in der Oberpfalz • Wolnzach • Wörthsee
E.DIS Netz · E.ON
Project locations: Brüssow • Heiligengrabe • Lindholz • Schönfeld • Zehdenick • Brandenburg an der Havel • Wiesenaue • Gnoien • Zossen • Malchin • Gielow • Roggentin • Warrenzin • Nossendorf • Treuenbrietzen • Linthe • Mühlenfließ • Rüdersdorf bei Berlin • Fehrbellin • Peenemünde • Marlow
In Germany, there are around 850 distribution system operators.
We build in every network area.
The major transmission system operators are only part of the picture. The vast majority of grids are operated by municipal utilities and regional suppliers – each with their own technical connection conditions, their own forms and their own testing practices. For us, this changes nothing about the outcome: you get a substation that is approved.
Sort out the grid connection
We submit the grid connection request, clarify the point of connection and the available connection capacity, and handle the correspondence with the grid operator.
Design according to the technical connection conditions
Design according to VDE-AR-N 4110 or 4105 and the technical connection conditions of the respective network operator – including protection concept and metering concept.
Submit documents
We fully prepare data collection sheets, e-forms and certificates of conformity so that the application to the network operator is not rejected in the first round.
Supply and commission station
In-house manufacturing, delivery and positioning, commissioning together with the network operator and handover of the documentation.
Send us your location and planned connected load.
We will provide you with an assessment of the responsible network operator, their requirements and the suitable substation design. You do not need a finished design for this.