Transfer & transformer station
The ideal all-rounder for your reliable transformer station medium-voltage connection.
Online enquiry
Solar park station
The first purely solar park-internal transformer station.
Reliable for solar parks of any size.
Online enquiry
Transfer & transformer station
The ideal all-rounder for your reliable transformer station medium-voltage connection.
Online enquiry
Solar park station
The first purely solar park-internal transformer station. Reliable for solar parks of any size.
Online enquiry
kW
0
Intelligent energy distribution for large solar parks. The next generation of solar park-internal container stations.
Centralised switching technology for modern energy systems. Ideal for trade, industry and agriculture.
Production in Germany

Compatible with all German medium-voltage networks, arc fault certified for nationwide use.

Delivery time from 28 weeks

Faster implementation thanks to in-house production and semi-automated planning process.

Full flexibility & support

Customised configuration of transformer power, voltage levels and balance circuits according to project requirements.

Compact substation Magdeburg for stable power distribution and predictable growth

One Compact transformer substation Magdeburg is the central node in the energy project between the grid connection and the internal distribution. It is precisely there that it is decided whether a site can be operated stably even with increasing load. In practice, a purely standard solution is often insufficient because space constraints, load profiles and expansion targets vary widely.
Faber E-Tec therefore develops every Magdeburg compact substation from the specific project parameters. The connected load, load profile, spatial layout, service accessibility, and planned development of the site are taken into account. This results in a robust overall concept with a clear technical direction.
The result is a system that runs reliably during daily operation and will not become a bottleneck for future requirements. Operators benefit from improved predictability, reduced rework and an infrastructure designed for long-term security of supply.

Sensibly structuring high performance in a limited space

In many projects in Magdeburg, electrical power has to be provided safely in a confined space. A high-quality Medium-voltage substation Magdeburg achieves this task not just through a compact design, but via a clear internal structure.
When switchgear, protection equipment and transformers are arranged logically, the substation becomes easier to manage during operation. Maintenance can be planned effectively, testing carried out efficiently and subsequent modifications implemented with significantly less effort.
Especially with tight timeframes, this structural quality is crucial because it reduces the risk of failure and sustainably strengthens operational reliability.

Early technical clarity reduces later project costs

Many delays occur when interfaces between planning, construction and commissioning are specified too late. A robust Magdeburg substation Planning therefore focuses early on clear responsibilities, coordinated protection concepts and consistent documentation.
Bringing together load assumptions, expansion paths, and commissioning procedures at an early stage measurably increases schedule reliability. At the same time, the risk of variations and costly rectifications is reduced.
For clients, this means greater control over budget and quality, and a significantly smoother project execution right up to handover.

Transformer Substation Line BG AVIF - Compact Transformer Substation Magdeburg
Transformer stations

for the safe mounting and operation of transformer and switching technology.

One Magdeburg transformer substation must prove itself in everyday operation. Peak loads, switching frequency, service windows and future expansions are part of the reality at many sites. That is precisely why Faber E-Tec towards a technical design that factors in operation right from the start.
Robust components, precise engineering and clearly structured documentation ensure that operators and service partners can work efficiently. As a result, the system remains transparent, easy to maintain and economically viable in the long term.
This creates a solution that not only looks good upon project completion, but delivers reliable performance over the years and can grow with the site.

High operational reliability

Reliable in continuous operation.

Weather protection

Designed for outdoor use

Configurable

Customisable to project requirements.

Versatile in use

For industry and infrastructure.

Optimised for continuous operation

Stable and powerful.

Quick installation

Simply by crane.

Compact design

Space-saving and efficient.

Compatible with all German medium-voltage grids

Arc fault certified for use throughout Germany.

Standard-compliant design

We take over the engineering and obtain approval from the responsible energy supply company

Applications for compact transformer substations in Magdeburg

Compact substations in Magdeburg with clear reserve planning

Our Magdeburg compact substation Solutions combine a small footprint with a high level of technical functionality. Useful reserves in terms of field structure, protection design and connection routing are planned for right from the initial design phase.
This keeps the initial investment economical and allows for subsequent performance upgrades to be implemented without a system breakdown.

Concrete transformer compact station and transfer station for photovoltaics, e-mobility, wind power and grid operators

Safely connecting and controllably expanding e-mobility

Plans for charging hubs, fleet locations and commercial charging points Faber E-Tec Solutions that properly account for real peak loads and simultaneity factor.
This is how the charging infrastructure grows in an orderly fashion in line with demand, while the grid quality remains stable.

Illustration of an e-mobility station, developed for the reliable power supply of charging stations for electric vehicles. Ideal for setting up centralised and decentralised charging infrastructure. Compact stations

Integrate solar and feed-in projects in a technically consistent manner

In feed-in projects, clear points of delivery and coordinated protection technology are essential. Our concepts combine transfer, protection and operation in a seamless technical structure.
This simplifies commissioning and increases controllability during ongoing operation.

Solar park station for PV systems and photovoltaic transformer
NSHV Black Line AVIF - Transformer Substation Magdeburg
LVMD

for safe and reliable power distribution in electrical installations.

EPC in Magdeburg with a clear accountability model

Planning and control, procurement, construction and assembly work

Complex energy projects become significantly more stable when all phases are managed using a shared logic. With the EPC approach, Faber E-Tec Engineering, procurement, construction and commissioning as an end-to-end process.
This reduces interface risks, decisions become reliable more quickly and processes remain transparent across all milestones. Clients benefit significantly in terms of time, budget and technical quality.

Extensive project experience
Complete turnkey solutions
Technical excellence & quality assurance
A central point of contact
Minimised risk & deadline reliability
Integrated energy infrastructure

Quality from Germany for critical energy infrastructure

Faber E-Tec developed and manufactured in Germany. This stands for consistent quality processes, traceable inspection steps and technical documentation with a high degree of practical suitability.
For operators with high requirements in terms of availability, service life and scalability, this depth of quality is crucial. A professionally planned Magdeburg substation remains resilient and economically viable in the long term.

Opened FABER E-TEC compact transformer station with visible technology - solution for photovoltaics, grid/transfer and e-mobility
Compact transformer station from FABER E-TEC in the solar park at sunset - grid connection and transfer station for photovoltaics
Expertise, experience & production in Germany
Expertise & experience
Highest quality & reliability
Environmentally friendly technologies
Opened compact station with low-voltage main distribution board and switching technology from Faber E-Tec buy online
Transformer station for connecting a fast charging station to the grid - energy infrastructure for e-mobility in outdoor areas

Enquire about compact transformer station Magdeburg with a clear technical schedule

Whether it is a new connection, a capacity expansion or the modernisation of an existing system, a structured project start determines its later stability.
Developed on the basis of load data, spatial conditions and expansion targets Faber E-Tec a sustainable concept for your Compact transformer substation Magdeburg, technically precise, economically viable and cleanly implementable.

Compact station Request a quote

Customised offers for transformer stations - made easy!

Order solar park station directly now

Fill in and receive PV transformer station offer!

E-mobility made easy with us!

Simply fill out the transformer station enquiry form and plan your charging station infrastructure!

"*" indicates required fields

1Project
2Net
3Contact us
This field is hidden when viewing the form
This field is hidden when viewing the form
Product type*
The output per station describes the size of the transformer or the maximum output that is to be transmitted via the transformer substation. For PV or battery storage projects, this value is often based on the system output. For industrial, commercial or consumption systems, the output depends on the building's or facility's required electricity demand. If you do not know the value, we will be happy to assist you with the design.
Overvoltage (kV)*

7200 KW Secure container offer

Order containerised transformer station for solar park quickly and easily.

"*" indicates required fields

1Project
2Net
3Contact us
This field is hidden when viewing the form
This field is hidden when viewing the form
Product type*
Project location*

Low-voltage main distribution board

Interested in our NSHV?
Frequently asked questions about the Magdeburg compact transformer substation
Find quick answers to frequently asked questions about our products & services.

Key factors are connected load, load profile, site layout, target date and planned expansion stages. The more precise this information is, the more reliably the station can be technically designed.

Through targeted reserves in the field structure, protection concept and connection routing. This allows later performance levels to be integrated without having to rebuild the entire system logic.

Especially with several trades running in parallel and tight timeframes. An integrated workflow significantly reduces coordination losses and increases project reliability.

Typical applications are industrial sites, larger commercial areas, logistics hubs, charging infrastructure and feed-in projects with growing load and high demands on security of supply.

Cool number
0
Compact station