Transfer & transformer station
The ideal all-rounder for your reliable transformer station medium-voltage connection.
Online enquiry
Solar park station
The first purely solar park-internal transformer station.
Reliable for solar parks of any size.
Online enquiry
Transfer & transformer station
The ideal all-rounder for your reliable transformer station medium-voltage connection.
Online enquiry
Solar park station
The first purely solar park-internal transformer station. Reliable for solar parks of any size.
Online enquiry
kW
0
Intelligent energy distribution for large solar parks. The next generation of solar park-internal container stations.
Centralised switching technology for modern energy systems. Ideal for trade, industry and agriculture.
Production in Germany

Compatible with all German medium-voltage networks, arc fault certified for nationwide use.

Delivery time from 28 weeks

Faster implementation thanks to in-house production and semi-automated planning process.

Full flexibility & support

Customised configuration of transformer power, voltage levels and balance circuits according to project requirements.

Transformer station experts in Hesse: Faber E-Tec for medium voltage with a clear operational strategy

In medium voltage, much is decided not on the day of delivery, but in everyday operations. A transformer substation is the switching point between the grid and the site. If this switching point is clearly structured, operations run smoothly. If it is set up confusingly, queries, rework and unnecessary downtime windows arise later. Exactly for this reason, expertise is more than just experience. It is the ability to plan substations so that they remain permanently comprehensible.

When Substation experts in Hesse sets Faber E-Tec to a substation logic that can be read at a glance. Panel layout, cable routing, measurement, protection technology and documentation must fit together. Then routine testing becomes a clear procedure, service interventions can be prepared and faults can be systematically isolated. This saves time during operation and protects availability because decisions do not have to be improvised.

Many projects in Hesse grow in stages. Additional feeders, new consumers or altered operations often come later. That is why structural reserve is a key point. Structural reserve means: expansion points are prepared, connection paths remain sensible, and the protection coordination remains consistent even after the next step. This is how medium voltage remains controllable in the long term.

Station design that makes service faster and reduces risks

A good transformer substation can be recognised by how quickly operations and service personnel gain orientation. Switchgear panels are logically structured, markings are unambiguous and components are accessible. As a result, maintenance does not turn into a search operation and inspections become repeatable. At the same time, the risk during interventions is reduced because the substation dictates a clear order.

Another factor is protection technology as part of the structure. If protection functions match the field logic and operate selectively, a fault remains small. Disconnection takes place precisely where it is technically necessary. This protects processes and prevents unnecessarily large shutdowns. Especially at sites with sensitive procedures, this is a real economic lever.

Determine the expansion path early on so that an extension does not become a renovation project.

Extensions are rarely completely surprising. Usually they are foreseeable: an additional exit, higher output, new areas at the site. Without a prepared expansion path, every extension becomes an intervention in the existing structure. This generates coordination, interruptions and avoidable additional costs.

Sound expert planning therefore sets guard rails early on. Where later outlets are to connect, how metering grows consistently, how protection coordination remains stable even when operating states change. If these points are visibly resolved in the concept, expansion becomes predictable. New power builds on existing order rather than breaking it up. Thus, the substation remains clearly arranged, even after several expansion stages.

Container loading station by Faber E-Tec
Transformer stations

for the safe mounting and operation of transformer and switching technology.

After commissioning, practice takes over. Maintenance, periodic testing, switching operations and occasional adjustments are all part of it. That is why there is a need for clear access points, clean panel labelling and documentation that accurately reflects the actual setup. When documentation and reality match, decisions are made faster and service call-outs are more efficient.

For growing projects, it is additionally important that extensions remain possible in an orderly manner. If extension points are prepared and connection routes remain clear, additional outlets can be added in stages. This keeps downtime windows small and prevents frantic retrofitting on existing systems.

High operational reliability

Reliable in continuous operation.

Weather protection

Designed for outdoor use

Configurable

Customisable to project requirements.

Versatile in use

For industry and infrastructure.

Optimised for continuous operation

Stable and powerful.

Quick installation

Simply by crane.

Compact design

Space-saving and efficient.

Compatible with all German medium-voltage grids

Arc fault certified for use throughout Germany.

Standard-compliant design

We take over the engineering and obtain approval from the responsible energy supply company

Where transformer substation experts are particularly in demand in Hesse, from industrial connections to infrastructure

Transformer compact station Berlin: maximum technology in a minimum space

Being compact is an advantage when the inside of the station stays tidy. Clear field allocation, clean cable routing and accessible components ensure that maintenance does not become a fiddle. Especially in areas with limited space, the internal arrangement determines whether the station can be operated quickly and safely later on.

It is also important whether the next step is already prepared. If an additional departure is realistic later on, it should be structurally anticipated in the field logic. That way, expansion remains a planned step instead of a retrofit with surprises.

Concrete transformer compact station and transfer station for photovoltaics, e-mobility, wind power and grid operators

E-mobility, storage, feed-in: Medium voltage for dynamic requirements

As charging capacity increases or storage is added, operating states change. If the station is not prepared for this, adaptations become unnecessarily complex. A neat solution plans for this evolution: expansion points, consistent measurement management and protection coordination that also maps later states.

This allows performance increments to be integrated in stages without having to overhaul the overall concept every time. This keeps the site operationally secure, even as usage becomes more dynamic.

Illustration of an e-mobility station, developed for the reliable power supply of charging stations for electric vehicles. Ideal for setting up centralised and decentralised charging infrastructure. Compact stations

Industry and commerce in Hesse: accurately mapping load profiles, not just applying kVA

In many companies, the real load profile is what matters. Load peaks, simultaneity factors, starting currents and expansions have a direct impact on system design and protection technology. An expert solution sets up the substation in such a way that the operating mode is understood and both measurement and protection coordination are tailored to it.

The benefit is evident in day-to-day operations: clearer processes, fewer queries, and controllable behaviour in the event of an error. This makes the station more economical in the long run by reducing downtime and rework.

Solar park station for PV systems and photovoltaic transformer
Black Line low-voltage main distribution from Faber E-Tec
LVMD

for safe and reliable power distribution in electrical installations.

EPC solutions in Hesse with clear responsibility from planning to commissioning

Planning and control, procurement, construction and assembly work

When engineering, procurement, execution and commissioning are managed in a single line, interface risks are noticeably reduced. Decisions become reliable earlier, inspection points clearer, and documentation more consistent. This reduces alignment meetings and ensures a handover that functions in operation.

Extensive project experience
Complete turnkey solutions
Technical excellence & quality assurance
A central point of contact
Minimised risk & deadline reliability
Integrated energy infrastructure

Faber E-Tec: technical quality from Germany for Hesse

Medium voltage builds operational trust. A transformer substation must be logically laid out, remain quick to handle during servicing and function reliably during expansions. Clear structure, consistent protection logic and documentation that explains the actual setup are the factors that make all the difference in the long run.

Opened FABER E-TEC compact transformer station with visible technology - solution for photovoltaics, grid/transfer and e-mobility
Compact transformer station from FABER E-TEC in the solar park at sunset - grid connection and transfer station for photovoltaics
Expertise, experience & production in Germany
Expertise & experience
Highest quality & reliability
Environmentally friendly technologies
Opened compact station with low-voltage main distribution board and switching technology from Faber E-Tec buy online
Transformer station for connecting a fast charging station to the grid - energy infrastructure for e-mobility in outdoor areas

Transformer Station Experts Hesse: Set up the project start cleanly from a technical perspective

A clean start begins with clear specifications: required connected load, load profile, available space, requirements at the grid connection point, metering concept and planned expansion stages. If these points are brought together early on, the substation can be planned precisely. This reduces queries and creates a solution that remains controllable even as growth occurs.

Compact station Request a quote

Customised offers for transformer stations - made easy!

Order solar park station directly now

Fill in and receive PV transformer station offer!

E-mobility made easy with us!

Simply fill out the transformer station enquiry form and plan your charging station infrastructure!

"*" indicates required fields

1Project
2Net
3Contact us
Product type*
The output per station describes the size of the transformer or the maximum output that is to be transmitted via the transformer substation. For PV or battery storage projects, this value is often based on the system output. For industrial, commercial or consumption systems, the output depends on the building's or facility's required electricity demand. If you do not know the value, we will be happy to assist you with the design.
Overvoltage (kV)*

7200 KW Secure container offer

Order containerised transformer station for solar park quickly and easily.

"*" indicates required fields

1Project
2Net
3Contact us
Product type*
Project location*

Low-voltage main distribution board

Interested in our NSHV?
Frequently asked questions about transformer substation experts in Hesse
Find quick answers to frequently asked questions about our products & services.

When space is at a premium and a compact design makes assembly much easier

Location Region, desired output, area of application, time frame and brief information on the grid connection

Because it defines the interface and noticeably simplifies acceptance and commissioning

It reduces queries, supports maintenance and makes subsequent expansions much easier

Cool number
0
Compact station