for solar power and e-mobility | incl. storage solutions
Background generated by AI
for solar power and e-mobility | incl. storage solutions
Delivery time from 18 weeks
Background generated by AI
Background generated by AI
Background generated by AI
Background generated by AI
Compact substation | Solution for EV charging parks
Background generated by AI
The first purely solar park-internal transformer station
Background generated by AI
7,200 kW output for large solar parks
Background generated by AI
Low-voltage main distribution board for solar and industrial applications
Background generated by AI
VDE-compliant protection up to 300 kW PV power
Background generated by AI
PV AC combiner for efficient solar farms
Background generated by AI
Substations from the manufacturer: manufactured in Bünde, designed for your mains connection
Faber E-Tec is a manufacturer of power distribution stations for photovoltaics, charging infrastructure, battery storage systems and industry. In our plant in Bünde, we cast the concrete structure ourselves and install the medium-voltage switchgear, transformer and low-voltage distribution system project-specifically. This way you receive a fully installed station that is tailored to your project and the network area.
Which station fits your connection concept
Our Compact stations Available with transformers up to 3,150 kVA, with or without a measuring cell, with a delivery time of 18 weeks. Depending on the connection concept, one station takes over the transfer and transformation jointly, or separately. Transfer station is at the network connection point. This depends on the network operator and the distance to the connection point.
The Solar park station has a low-voltage side for connecting the inverters. For charging infrastructure, there is the Substation for charging parks, for storage projects that Substation for battery storage.
Planning and coordination with the network operator
Each station includes the design in accordance with the technical connection conditions of the responsible network operator, the necessary documentation, and the technical coordination with them. Transport, installation and maintenance We will also take on this responsibility if requested.
Faber Energy Group · Family business with roots in electrical installation since 1995 · Management system certified according to ISO 9001 and ISO 45001 (SystemCERT, 2026) · View references
Your request
For a preliminary assessment, the location and planned connection capacity are sufficient. The relevant network operator, the voltage levels, and the information whether you are drawing electricity from the grid or feeding it in are also helpful. If a value is missing, we will clarify it together.